Chennai Metro Rail to complete tunnelling work from Royapettah to Thousand Lights next month
AI Summary
Chennai Metro Rail is expected to complete tunneling work on the corridor from Royapettah to Thousand Lights by next month. This is part of Phase II, Corridor 3, which spans 45.8 km connecting Madhavaram to SIPCOT with several stops along the route.
In corridor 3 of the phase II network covering 45.8 km, trains will depart from Madhavaram and will pass several areas, including Royapettah and Thousand Lights before making the last stop at SIPCOT