Fugro Secures New Offshore Wind Survey Work in UK Waters
AI Summary
Fugro has won a contract from Cadeler to conduct post-installation seabed surveys at the 960 MW East Anglia TWO offshore wind farm in UK waters. The survey work is scheduled to begin in early 2027.
Fugro has secured a contract from Cadeler to carry out post-installation seabed surveys at the 960 MW East Anglia TWO offshore wind farm in the UK, with work scheduled to begin in early 2027β¦