Rusted pontoon bridge left unused for 13 years shifted from Bardiya to be installed at flood-hit Phurkekhola, Dhading

🌐 Kathmandu Post (NP) —
Rusted pontoon bridge left unused for 13 years shifted from Bardiya to be installed at flood-hit Phurkekhola, Dhading

AI Summary

A rusted pontoon bridge unused for 13 years is being moved from Bardiya to Phurkekhola in Dhading for refurbishment. It is intended to restore transport between Gajuri and Siddhalek after floods destroyed the concrete bridge.

The pontoon bridge, which once connected Rajapur with other parts of Bardiya, is being refurbished to restore transport links between Gajuri and Siddhalek after floods swept away the concrete bridge.

World Real Estate Travel Nepal pontoon bridge flood damage transport links infrastructure Dhading

Read original source →