Trenitalia commande 19 trains à Hitachi et confirme l’ouverture de la liaison Paris-Londres en 2029

route change expired 40% Shipping

Trenitalia has placed an order for 19 new high-speed trains from Hitachi, designed for operation across major European networks. These trains will undergo certification for the Channel Tunnel and the UK market, enabling the planned Paris-London rail connection by 2029.

🇫🇷 Location: London — Sources: 1 — First seen: Last seen:
Trenitalia Hitachi high-speed trains Paris-London rail European networks

Contributing Articles